Jump to content

Leaderboard

Popular Content

Showing content with the highest reputation on 01/17/2025 in all areas

  1. Got everything I wanted to get done today. I was able to fill in all the cracks. Got the gasket installed. Gave her a good wipe down and in the process noticed a few cracks that need to be filled and 2 tiles that had cracks in them that I didnt notice the first time around. Just going to leave those there as they are not noticeable. Called Dennis and he was able to walk me thru the adjustments to the front draft door to get it to sit flush. It is almost perfect. May need to tweak it a little more but not much. Here are the before and after shots. Been a long road but happy with the result. Burn in is set for Wed which means the first cook is a brisket next week. Before FINAL!!!
    1 point
×
×
  • Create New...