I would ping Dennis on the method you are referring to.
I recall seeing photos of two guys using 2x4's and rope tied to each leg individually moving the base.
But, if you have a cement pathway, is it not wide enough to roll the KK sideways on it?
Or you can buy 3 sheets of plywood and leap frog the plywood sheets as you roll the KK on them.